المشاركات

عرض المشاركات من أكتوبر, ٢٠١٩

Palace in jumeirah First

صورة
Palace in jumeirah First Profession        : …………..     Project Manager Project             :  ..............     LUXURY VILLA   PLOT NO3324573 , Jumeirah 1st ,DUBAI ,UAE Consultant        : …………...     ARCHITECTURE & PLANNING GROUP (A.P.G) Start Date         : .............      02/05/ 2014. End Date          : …………...     02/06/2016 Area of Plot       : .............   280953 Sq Ft Build Up Area     : .............   94475   Sq Ft This  LUXURY VILLA  Contains  Main Villa :-  23 Bed Room  Ground Floor Area    44881 Sq Ft First Floor Area        17474  Sq Ft Swimming Pool Building :- Ground Floor Area    12191 Sq Ft Service Block  :- Ground Floor Area    6187 Sq Ft Staff Accommodation :- Ground Floor Area     8092 Sq Ft Bundary Wall Length  2318 FT 706.75 Lm

AL MANARA Villa (Dubai) - UAE

صورة
Profession           :      Project Manager Project                :      AL MANARA VILLA    Consultant            :    MEECON (MIDDLE EAST ENGINEERING CONSULTANT) Start Date                         :       01/08/ 2013. End Date                          :        01/05/ 2014 Area Of Plot       63636 Sq ft Built Up Area     28791 Sq ft The Al Manara is located in the Al Manara Area Plot No. 363-1101, Dubai, The Scope of Works for the Al Manara Villa will consist of the refurbishment and extension of the existing villa levels (basement, ground and 1st floor), Construction of new Guest Villa, landscaping works, boundary wall and diversion works. 

Jumeirah Park –package 4&4a 409 Villa (Dubai) -

صورة
Profession:                     Project Manager Project:                         Jumeirah Park –package 4&4a - construction&completion of villas(409villas) Consultant:                    Dar Al Handasah Start Date:                       27/01/ 2013. End Date :                     01/08/ 2013     The scope of works comprises the completion of the remaining works for 409, 3-large bedroom Villas at Jumeirah Park Project in Dubai as required in the Original Construction Contract; The works include but are not limited to the completion of the Architectural and MEP works , supply of any missing material, completing and make good any poor workmanship to an acceptable  completion quality and remedy any defect and latent defect that may appear during the Defect Liability Period. This includes all the testing and commissioning, attending to the works listed in outstanding /snag lists, obtaining authorities approvals, and connections of the temporary

Jumeirah Park – package ( 5&5a/1 & 6/2 ) 211 villa (Dubai)

صورة
 6/2  & Jumeirah Park – package ( 5&5a/ 1 Regional                        Legacy Profession: ………….     Project Manager General Information 0.1        Contracts Particulars Employer                                  M/s Nakheel   Consultant                                M/s Dar Al Handasah Consultants(DAR) Contractor                                M/s Al Shafar Civil Engineering(ASCE) Contract No(s)                                  D-JP-P5-007 for 5&5a/1 and                                                               D-JP-P6-010for 6/2 . Contract Sum  for package 5&5a/1                  AED 115,513,983.00 Contract Sum  for package 6/2                        AED 104,644,512.00 Revised Contract Sum                                        - Provisional sum - materials                              Included in contract sum Provisional sums                                             Included in contract sum Date of Signi

ALkamel city (6 October City ) - Egypt

صورة
Profession: ………….     Project Manager Project description:    Group of   BUILDING  15 Number          (GROUND+3FLOOR) RESIDENTIAL BUILDING. Consultant……………     Concept Start Date: ............       11/01/ 2010. End Date: .............       01/09/2010.  This Building Have 16 Flats Three Bedroom 

Al Shafar New Building

صورة
Profession: ………….     Project Manager Project description:      2 BASEMENT+GROUND+8FLOOR+GYM+S. P. RESIDENTIAL BUILDING. Consultant……………      ARKPLANE Start Date: ............       01/11/ 2008. End Date: .............     01/04/2009.

Ivory Grand ( Hotel Apartment )

صورة
Profession: ………….     Project Manager Project description:     3 BASEMENT+GROUND+14 FLOOR+GYM+S. P. HOTAL APARTEMENT.    (shoring, excavation works, driving piles, cap&footing) Consultant……………      MEECON Start Date: ............       02/04/ 2009. End Date: .............     4/9/2009

DUBAI SILICON OASIS ( DUBAI )

صورة
Profession: ………….     Project Manager Project description:      BASEMENT+GROUND+11FLOOR+GYM+S. P. RESIDENTIAL BUILDING. Consultant……………      DUBARCH (ARCHITECTURE – ENGINEERING-INTERIOR DESING ) Start Date: ............       15/03/ 2008. End Date: .............     26/10/2008.(From Start To Ground Floor Slab)

SILICON ARCH

صورة
Profession: ………….     Construction Manager Project description:         BASEMENT+GROUND+8FLOOR+GYM+S. P. RESIDENTIAL BUILDING. Consultant……………      National Engineering Bureau Management………...     Arcan Project Management Start Date: ............       23/05/ 2007. End Date: .............     14/03/ 2008

Byblos Hotel AT EMIRATES HILLS ( DUBAI )

صورة
Profession: ………….     Construction Manager Project description:       2 B+G+M+14 FLOOR+GYM+S. P. RESIDENTIAL BUILDING. Consultant……………      DUBARCH Start Date: ............       16/09/ 2006. End Date: .............     22/05/2007 ( From inception To 6 th   Floor Slab)

AL Nahda Grand Residence Building

صورة
With - AL-OROBA Contractor Dubai–U.A.E(from 02/07/ 2005 till 15/09/2006) Location :  AL NAHDA SECOND ( DUBAI ) Profession: ………….     Project   Engineer Project description:        BASEMENT+GROUND+11FLOOR+GYM+S. P. RESIDENTIAL BUILDING. Consultant……………      F.A.BAKER CONSULTANTS Start Date: ............       05/07/ 2005. End Date: .............      15/09/2006 This Building Have 44 Flats two Bedroom & 22 Flats one Bedroom with Gym and Swimming Pool